Stadium Intersection, Sochi (2009-2011)
Parameters:
- Two-level interchange
- Bridge over the Bzuga River
- Slip roads
- 6,380m crossovers
- Support walls
- Reinforced ground of more than 1 km
The construction of the new interchange will manage the transit flows of vehicles outside dense urban areas improving transport connections to the peripheral regions of Sochi and highway M-27 Dzhubga Sochi.

