Kurortny Avenue Relief Road in Sochi, phase 1 (2012)









Construction of the second and third phases of Kurortny Avenue alternate route between 172nd kilometre of the M-27 “Dzhubga-Sochi” Highway (Psahe river) and the PK0 Sochi bypass (Agura river) including reconstruction of a section of the road between Zemlyanichnaya Street and Kurortniy Avenue, Sochi.
The first phase of the Kurortny Avenue relief roud (from the river Agura to Zemlyanichnaya Street):
- Two flyovers with a total length of more 2.3 km (2.2 km and 100 m, respectively) and the height of up to 24 m;
- The number of lanes is 2 (one-way);
The seismic activity in the construction segment was 8.5 points.