Balanced cantilever assembly of steel bridge structures
The span structure is assembled using consoles without scaffolding
This technology allows a decrease in the volume of support structures and the erection of bridge structures over existing buildings, roads and transportation lines
Assembly rate up to 1500 t per month
Lifting equipment:
- Movable cranes and caterpillar cranes with lifting capacity up to 400 t and the capacity to lift the construction element to a height of up to 130 m
- Derrick cranes MDK-63, DK-25, and UMK-2, installed directly at the mounted bridge structure
- Floating cranes