Construction of reinforced concrete bridges using precast elements and installation of the full length bridge structures with cranes

Construction of reinforced concrete bridges using precast elements and installation of the full length bridge structures with cranes

Mostotrest constructs both precast and combined precast/cast in-situ structures

Technology used includes precast pre-stressed concrete girders joined with reinforced concrete deck

The technology is particularly suitable for construction near operating railways as rail traffic is only disrupted for a short period during bridge structure erection

Equipment:

  • Railway crane with capacity 150 t (allows the assembly of a span structure of up to 45 m in length)