Construction of bored piles, drived piles, sheet piles and diaphragm walls
Bored piles are used in deep foundations with significant loads on piers
Depending on ground characteristics the piles may be constructed using both the inventory steel casing and without them, filling the pile with concrete just after the boring instrument is lifted
Using boring equipment produced by international manufacturers, such as Bauer, Liebherr and Junttan, Mostotrest constructs piles with a diameter from to 3.0m and depth of up to 100m