Construction of a massive foundation and piers

Construction of a massive foundation and piers

Excavation of foundations under the protection of steel sheet pile walls, including those laid directly in river streams

Pouring the concrete of large foundations of any size up to a rate of 120 cubic metres/hour

Construction (including at temperatures below zero) of the piers in both movable and inventory falsework

The pouring of concrete is done using concrete pumps with productivity of up to 80 cubic metres/hour