![](/upload/iblock/6b9/v0rf6zz3w6qz5d1xcmrrclr2wyyw84bw/631c5b34b5601ee3d7a6e8b3f7f27f7a.jpg)
Bridge over Karatash Valley, bridge over Bayindir water reservoir, bridge over Chubuk water reservoir.
Challenge:
- 105m towers were used to construct the bridges;
- The Construction work was conducted in an area with high seismic activity;
- Mostotrest was commended for the quality of the construction and the use of applied technologies by the leading international construction corporations responsible for supervising the works.