Parameters:
- Construction of an industrial freight terminal and overhaul of the Khmylovskyi station; construction of a railway between the terminal and the Khmylovskyi station.
Challenge:
- The hilly terrain of the locality required the port to be built a distance away from the station;
- The ground of the wet dock is more than 20km away from the railway.