![](/upload/iblock/a25/gek4oebnhq7cwogde9lnqh2q07dymj5a/a36564df30170dc076bc44193cbe7f15.jpg)
- First segment of the Vladivostok – Nakhodka - Port Vostochny highway (0-3.5km);
- The length of the future high-speed road will be over 40 km.
Features:
- The construction work was carried out on marshy ground, in an area with poor soil-bearing capacity, which was replaced with crushed stone.