Connects the Taman Peninsula (Krasnodar Region) and the City of Kerch (Crimea).
Total length: 19 km. Two traffic lanes in each direction. Authorized speed: 120 kmh.
227 m fairway arches.
Elevation above sea level: 35 m.
Light vehicle traffic launched on 16 May 2018. Scheduled launch of truck traffic: 1 October 2018.