The project included construction of four flyovers with a total length of more than 3 km, three exits, two parallel six-lane bridges across the river Likhoborka and two railway crossovers on a connecting track of the Oktyabrskaya Railway.
In addition, Mostotrest built more than 10 km of roads, including the main road and exits from traffic interchanges, and rebuilt the adjacent road network.
The NET segment is a Category 1 main city street with through traffic.