Ongoing construction of a crossover above Komsomolskaya Street and railway tracks in the area of Kirov-1 Station and the river Mostovitsa.
Length: 385 m; width: 35 m.
The project also envisions construction of the crossover approaches. The 1.5 km road will have 6 lanes (3 in each direction). In addition, Mostotrest will rearrange utility networks, install a modern barrier fence to ensure traffic safety, and build public transport stops.
The new crossover will create a direct link between the Chistiye Prudy new residential district and the centre of Kirov.